Add your organization to OuterSpatial. Get started now for free.
City of Bloomington Parks and Recreation Logo

Clear Creek Trail

Trail 

0 Reviews

Report

Report incorrect or missing information.

Clear Creek Trail stretches 2.4 miles from Country Club Drive past Tapp Road to Church Lane, connecting to the existing Bloomington Rail Trail. The entire length of the Clear Creek Trail is paved and accessible, however the Bloomington Rail Trail, which connects to the Clear Creek Trail just north of the 1887 historic bridge, is not accessible. Please stay on the trail and remember the Leave No Trace principles when hiking in the area.

Parking is available at Clear Creek North Trailhead along W Tapp Road, a central parking lot along W That Road, and at the Clear Creek South Trailhead along W Church Lane.

Bloomington Parks and Recreation Park Property Rules

Report a problem on the Clear Creek Trail

Trails in Bloomington

    History

    Clear Creek Trail was acquired in 1997 by 12 separate purchases with the City of Bloomington Utilities. A 'linear park', this trail offers an alternative means of transportation and represents a long-term commitment to connect public facilities by routes that do not require vehicles. Phase I of the Clear Creek Trail between Tapp Road and That Road was opened on May 23, 2001. Phase II from That Road to Church Lane opened on Oct. 30, 2003.

    The 150' wrought-iron bridge was moved from its original home in Warren County where it spanned Big Pine Creek since 1887. The bridge was painstakingly restored, then placed over Clear Creek near the Church Lane trailhead on August 1, 2003.

    Additional Information

    Allowed Access
    Bicycles
    Dogs
    Pedestrians
    Activities
    Birdwatching
    Dog Walking
    Hiking
    Road Biking
    Rollerblading
    Skateboarding
    Trail Running
    Wildlife Watching
    Accessibility
    Adaptive Mountain Biking
    Stroller Friendly
    Wheelchair Accessible
    Rules & Regulations
    Carry Out Trash
    Dogs On Leash
    No Campfires
    No Camping
    No Horses
    No Motorized
    No Motorized Wheeled Vehicles
    Pack Out Dog Waste
    Stay On Trail
    Accessibility Description

    The entire length of the Clear Creek Trail is paved and has accessible parking locations. The Bloomington Rail Trail, which connects to the Clear Creek Trail just north of the 1887 historic bridge, is not accessible.

    Overview

    • Get Directions
      197.80 mi Away
    • Lat/Lng
      39.13653, -86.56126
    • Length
      2.34 Miles